保定馳情模具銷售有限公司
主營產(chǎn)品: 塑料模
預(yù)制混泥土路邊防撞墻模具-馳情模具-混泥土路邊防撞墻模具定做
價格
訂貨量(件)
¥12.00
≥1
店鋪主推品 熱銷潛力款
䀋䀏䀒䀐䀐䀑䀏䀎䀍䀍䀍
Before formwork erection, it is necessary to measure to correct the foundation elevation of anti-collision wall. Too high or too low foundation will have a very serious impact on the later ctruction. If it is too high, the higher part must be chiseled out when installing the formwork, which is time-cuming, laborious and expensive. If it is too low, there may be gaps at the bottom of the formwork in the later stage, which will cause cement slurry to flow out and cause pockmarked surface.
支模時需要測量來確定防撞墻的平面位置和鋼模的標(biāo)高,這決定了防撞墻的線型和美觀問題,測量不準(zhǔn)確,容易造成防撞墻歪歪扭扭、高低不平,嚴(yán)重的甚至?xí)乱欢畏雷矇π纬慑e臺,一旦產(chǎn)生錯臺,后期的處理將會耗費更多的時間、精力、金錢。測量準(zhǔn)確了,防撞墻成型以后,線型流暢,看起來就會很舒服、很漂亮。
每10m設(shè)置一道斷縫(如設(shè)計有要求,參考設(shè)計,并調(diào)整與假縫位置對應(yīng)),內(nèi)填瀝青軟木板,斷縫板加工先制作標(biāo)準(zhǔn)模板(注意預(yù)留路燈設(shè)施管道開孔)再批量生產(chǎn),安裝時調(diào)整垂直,兩側(cè)焊接U型鋼筋夾緊,混凝土對稱澆筑;按設(shè)計位置安裝路燈接線盒和雨水口預(yù)留槽模板,安裝位置準(zhǔn)確(平鋪模板,試安裝以確定位置,記錄數(shù)據(jù),交底到位),固定牢靠,邊部貼海綿條預(yù)防漏漿。
2. Set up a crack every 10m (such as design requirements, reference design, and adjust the ition corresponding to the false crack), fill with asphalt cork board, make standard formwork (pay attention to reserving the opening of street lamp facilities pipeline) before mass production, adjust the vertical when installing, weld U-shaped steel bar clamping on both sides, symmetrical pouring of concrete. Install the template of street lamp junction box and rainwater outlet reserved groove according to the design ition. Install the template accurately (lay the template flat, try to install to determine the best ition, record data, submit the bottom in place), fix firmly, and stick sponge strip on the edge to prevent leakage.