河北宏旭模具制造有限公司
主營產品: 護坡模具
宏旭平鋪式框格生態(tài)護坡模具-平鋪式生態(tài)護坡模具-框格護坡模具
價格
訂貨量(套)
¥490.00
≥5
店鋪主推品 熱銷潛力款
㠗㠓㠔㠙㠙㠚㠖㠖㠓㠖㠖
在線客服
宏旭平鋪式框格生態(tài)護坡模具 平鋪式生態(tài)護坡模具 框格護坡模具
模具的樣式比較多,但是一般框格護坡模具都會設計成方形,然后在擺放的時候,是每兩個斜邊挨放在一起。模具合理的擺放方式可以很好的保護環(huán)境,并且還可以在模具的內部種植上一些綠色植物,從而更好的美化環(huán)境,提升城市的形象。平鋪式護坡模具在制作的時候,需要使用到信息標注詳細的模具圖紙,這樣可以更好的方便我們進行模具的制作。模具需要根據實際的情況來進行生產,模具澆筑好混凝土之后需要放置到震動平臺上進行震動,然后等待其凝固成型之后就可以進行脫模了。
隨時輸送營養(yǎng)給生態(tài)植被??蚋褡o坡模具要做好充分的準備工作,保證在施工的過程當中設備的完善,我們準備優(yōu)質的混凝土和專業(yè)的振動平臺,而且還要準備脫模劑讓工人在進行涂刷,這樣做不僅能夠有效保護模具的內壁不受損傷,也能提高它的使用時間和次數,加速水泥在模具里面凝固成型的時間,這種框格護坡不僅用在了水利護坡的建設當中,也在高鐵高速項目方面發(fā)揮了重要的作用,因為使用的范圍不同,所以尺寸規(guī)格也是不盡相同。
here are many patterns of molds, but generally, the frame slope protection molds are designed to be square, and then when they are placed, they are placed next to each other. The reasonable placement of the mold can protect the environment well, and also can plant some green plants inside the mold, so as to better beautify the environment and enhance the image of the city. When making the flat slope protection mold, we need to use the information to mark the detailed mold drawing, so that we can make the mold more convenient. The mold needs to be produced according to the actual situation. After pouring the concrete, the mold needs to be placed on the vibration platform for vibration, and then it can be demoulded after waiting for its solidification.
Transport nutrition to ecological vegetation at any time. The frame slope protection mould shall be fully prepared to ensure the perfection of equipment in the construction process. We shall prepare high-quality concrete and professional vibration platform, and prepare release agent for workers to brush. This can not only effectively protect the inner wall of the mould from damage, but also improve its use time and times, and accelerate the solidification of cement in the mould In the forming time, this kind of frame slope protection is not only used in the construction of water conservancy slope protection, but also plays an important role in the high-speed railway project. Because of the different range of use, the size and specification are also different.